The objective of the game is to redesign your class project, with the lowest possible operational Source Energy Use Intensity (Source EUI, kWh/m2) as simulated in DIVA/Archsim/EnergyPlus. Starting off with an approximate thermal model of your latest design from Assignment 6, your task is to create a version of your building with the lowest Source EUI and a purchasing budget at or under $50 MIT dollars. The team with the largest proportional EUI reduction vis-à-vis their baseline design wins. Follow all rules below. When time is up (after 80 minutes), your team must save all of your files and submit them along with a detailed description of your final designs and how you arrived at your best performing iteration.